View progress of the ERP (image is refreshed
every 45 seconds)
The Emission Reduction Project (ERP) at the
Silver Lake Plant is a $37 million state-of-the-art
project that will greatly reduce the amount
of nitrogen oxides, sulfur dioxide, mercury
and particulate matter.
Projected reduction amounts-
Sulfur Dioxide- up to 85%
Nitrogen Oxides- up to 60%
Mercury- up to 80% to 90%
Particulate Matter- a significant reduction
The ERP involves improving the 55-megawatt
Unit 4 generator by adding a scrubber and
baghouse system for treating flue gas emissions.
• a fabric filter baghouse
• a fly ash system for greater fugitive
emission control
• a dry scrubber that generates a chemical
reaction to reduce the sulfur dioxide to a
non-intrusive calcium sulfate
View
graphic rendering of ERP
The ERP is scheduled to be completed by late
2009.
|